Project Feature - Pavers, Stone N' Retaining Walls!
Project Information
If you haven't yet learned about the many services C N'R offers and the
C N' R servicemark
"One Call... One Company!"SM ; this project from 2010 is a prime example
of both the wide array of services C N'R offers and the amazing results
C N'R delivers.
Whether you are interested in retaining walls, pavers, landscape
lighting, drain tile, pond/water features, steps, mulch, and rock OR
simply seeing what C N'R can do - you've come to the right place!
Please take a moment to browse this project below and imagine all the
possibilities of what C N'R can do for you!
Below we have included several 'Before - During - After'
sequences with additional project information. Click on any photo
to see a larger version.
There are also some additional photos of various stages of the project
Note: This navigation
bar located through the page will help you navigate your way
though the project! |
Project Facts - Materials Used
|
The driveway began as an un-even cracked concrete area as shown
below. 24 Tons of concrete and rebar were broken up and removed.
After some of the old underlay dirt was removed, Class 5 rock fill
was used to create a stable underlay for the new cobble paver
driveway.
The Class 5 fill was generally installed to a depth of 12" however
in some areas where C N' R found very soft and sandy areas, the
thickness of the Class 5 fill was installed to 18" in depth.
925 square feet of pavers were installed as part of the driveway
replacement - including the decorative trim and circular medallion
design show in the photos below.
Be sure to notice the tight integration of the pavers with the
existing garage, house wall, sidewalls and driveway apron.
-- Go To: -- Driveway -- Patio -- Front Walk -- Fountain -- Back to top --
The Patio Area (including Stone Retaining Wall, Patio Pavers, Steps, Irrigation, Lighting, Drainage, Steppers and Fence)
The patio portion of this project involved many parts. C N'R Removed 20 tons of concrete and rebar to prepare the area for the new paver patio with integrated grate drains and drain tile system. Approximately 850 square feet of pavers were installed, including the decorative trim pavers and circular medallion design. After some of the old underlay dirt was removed, Class 5 rock fill was used to create a stable underlay for the new cobble paver patio. A retaining wall was built which included 105 square feet of Fond Du Lac stone and integrated Fond Du Lac steps where sloped concrete was removed. In addition, some bushes were removed and new pavers, mulch and a fence were installed. A bubbling fountain style water feature was also re-built as part of this project, a separate section is dedicate to that. As you can see in the photos below, each of the pieces really come together to create a stunning outdoor living space.
-- Go To: -- Driveway -- Patio -- Front Walk -- Fountain -- Back to top --
The Front Walkway (including Stone Steps, and Pavers):
The patio portion of this project involved many parts. C N'R Removed 20 tons of concrete and rebar to prepare the area for the new paver patio with integrated grate drains and drain tile system. Approximately 850 square feet of pavers were installed, including the decorative trim pavers and circular medallion design. After some of the old underlay dirt was removed, Class 5 rock fill was used to create a stable underlay for the new cobble paver patio. A retaining wall was built which included 105 square feet of Fond Du Lac stone and integrated Fond Du Lac steps where sloped concrete was removed. In addition, some bushes were removed and new pavers, mulch and a fence were installed. A bubbling fountain style water feature was also re-built as part of this project, a separate section is dedicate to that. As you can see in the photos below, each of the pieces really come together to create a stunning outdoor living space.
-- Go To: -- Driveway -- Patio -- Front Walk -- Fountain -- Back to top --
The Fountain Water Feature Area:
The patio portion of this project involved many parts. C N'R Removed 20 tons of concrete and rebar to prepare the area for the new paver patio with integrated grate drains and drain tile system. Approximately 850 square feet of pavers were installed, including the decorative trim pavers and circular medallion design. After some of the old underlay dirt was removed, Class 5 rock fill was used to create a stable underlay for the new cobble paver patio. A retaining wall was built which included 105 square feet of Fond Du Lac stone and integrated Fond Du Lac steps where sloped concrete was removed. In addition, some bushes were removed and new pavers, mulch and a fence were installed. A bubbling fountain style water feature was also re-built as part of this project, a separate section is dedicate to that. As you can see in the photos below, each of the pieces really come together to create a stunning outdoor living space.
-- Go To: -- Driveway -- Patio -- Front Walk -- Fountain -- Back to top --